Kern Cluster
The Kern Cluster is located southwest of Bakersfield. The cluster connects 8 digesters from both sides of the I-5 and has been injecting renewable natural gas (RNG) into the utility transmission line since August 2020.




Kern Cluster Statistics
Eleven operating digesters
Eight RNG and three electricity projects
Approximately 339,000 metric tons of CO2e reduced per year
Generating 900,000 MMBTUs per year
Equivalent to removing 74,000 passenger vehicles from the roads per year
